Project Concepts Open House #3
Recommended Approach
Traffic Management Plan - Modified 5 Leg Signal Operation
Traffic Management Plan - Franklin Bridge Lane Configuration
Traffic Management Plan Queuing Analysis
Figure Q23 - 2014 + 0.5% + CC AM Peak with Modified 5 leg signal with 4 lane bridge
Figure Q24 - 2014 + 0.5% + CC PM Peak with Modified 5 leg signal with 4 lane bridge
Figure Q25 - Existing AM Peak with Modified 5 leg signal with 4 lane bridge
Figure Q26 - Existing PM Peak with Modified 5 leg signal with 4 lane bridge
Alternatives Considered
Roundabout Concepts
Signal Concepts (54M)
Trail Concepts (54M)
What happens when the traffic management plan is no longer effective
If the Long Term Plan is a 4 Legged Signal...
If the Long Term Plan is a Roundabout...
If the Long Term Plan is a Trail...

Franklin Avenue (CSAH 5) 