Project Concepts Open House #3


Recommended Approach

Traffic Management Plan - Modified 5 Leg Signal Operation
Traffic Management Plan - Franklin Bridge Lane Configuration


Traffic Management Plan Queuing Analysis

Figure Q23 - 2014 + 0.5% + CC AM Peak with Modified 5 leg signal with 4 lane bridge
Figure Q24 - 2014 + 0.5% + CC PM Peak with Modified 5 leg signal with 4 lane bridge

Figure Q25 - Existing AM Peak with Modified 5 leg signal with 4 lane bridge
Figure Q26 - Existing PM Peak with Modified 5 leg signal with 4 lane bridge

Forecast Graph 2014


Alternatives Considered

Roundabout Concepts
Signal Concepts (54M)
Trail Concepts (54M)


What happens when the traffic management plan is no longer effective

If the Long Term Plan is a 4 Legged Signal...
If the Long Term Plan is a Roundabout...
If the Long Term Plan is a Trail...