Sussex Main Street

Current Project Status

The project entered into the roadway conceptual design phase where the design team compiled several roadway concepts that were evaluated to meet the project goals set by the Village. These concepts were introduced to the public at the Village’s annual Spring Fest activities on March 17, 2012. To gather as much public opinion as possible and to aid in the selection of a preferred concept, the Village welcomed comments on the roadway concepts thru April 13, 2012.