This multi-year, ongoing project addresses stabilization/reclamation of tailings dams on Silver Creek and improvements/upgrades to embankment dams/dikes and hydraulic structures forming a series of treatment ponds adjacent to the Dolores River.
Features
-
Slope stabilization and installation of “rock mulch” covers for three abandoned tailings dams
-
Riprap and grouted riprap armoring of realigned portion of Silver Creek bypassing the tailings dams/ponds
-
Decommissioning of an existing SEO jurisdictional dam
-
Modifications/upgrades to 6 or more existing earth dams at St. Louis Ponds System adit discharge treatment site, including emergency spill- ways and overflow and/or piped outlets at each dam (ongoing)
-
Storm water runon controls (ditches/berms) to safely route uncontaminated flows around treatment system
SEH Services
-
Site investigations (drilling, test pits, geotechnical testing)
-
Hydrologic analyses for stormwater runon and flood control
-
Evaluation of alternatives, including preliminary design and costing
-
Civil, hydraulic, and geotechnical design analyses
-
Final design and preparation of plans and specifications
-
Construction observation, shop drawing review, and oversight of testing
-
Technical design support during construction