Project involved replacement of a failing retaining wall which supported a parking area and grounds around an office building.
Features
-
100-foot long tiered timber retaining wall
-
Geogrid tie-back system
-
Light-weight aggregate backfill
-
Auxiliary stormwater collection system at top of slope
SEH Services
-
Geotechnical investigation and slope stability analysis
-
Retaining wall design
-
Stormwater collection system design
-
Civil site design
-
Preparation of construction plans and specifications
-
Construction administration services