Client:
Metropolitan Council Environmental Services
Location:
Maple Plain, Minnesota
Features
-
6,000 feet of twin 16-inch HDPE forcemain
-
12-inch HDPE temporary sewer bypass to maintain sewage flow during construction of permanent force main
-
Three multi-purpose valve structures and one air release structure
-
Seven tunnels totaling approximately 1,810 feet
-
Construction of forcemain concurrent with Mn/DOT reconstruction of Highway 12
SEH Services
-
Design of permanent forcemain and temporary bypass
-
Development of geotechnical subsurface investigation program
-
Tunnel design
-
Preparation of construction plans, specifications, and cost estimate
-
Extensive construction staging coordination with Mn/DOT
-
Construction engineering services