Client:
Wisconsin Department of Transportation
Location:
Chippewa Falls, Wisconsin
Award: Wisconsin Department of Transportation Excellence in Highway Design
Features:
-
Multiple corridors considered
-
Three design and construction phases
-
Twin 900-foot-long, five-span steel plate girder bridges with four-lanes and trail
-
Four-lane rural arterial for 4.4 miles on new alignment
-
Bike path from STH 29 to CTH S
-
Roundabout at CTH S and Seymour Cray Senior Boulevard intersection
-
155-foot-long, three-span continuous structural concrete slab bridges over railroad
Services:
-
Preliminary alternative planning
-
Public involvement program
-
Construction sequencing and traffic control
-
Design, plans and specifications
-
Right-of-way platting
-
Geotechnical investigation