Client:
Minnesota Department of Transportation
Location:
Minneapolis, Minnesota
Award: 2006 ACEC Grand Award
Features:
-
Reconstructed an at-grade signalized intersection to a full access grade-separated interchange
-
Reconstructed 1.6 km (1.0 miles) of four-lane freeway with auxiliary and collector-distributor lanes
-
Constructed 1.0 km (0.6 miles) of four-lane expressway
-
Coordination with Federal properties including Veterans Administration Hospital, Bureau of Mines, Army Reserve
-
and St. Paul, Minneapolis International Airport
-
Constructed new drainage outlet to the Mississippi River
Services:
-
Preliminary design to finalized staff approved layout
-
Final roadway, signal and lighting design to Mn/DOT and FHWA standards
-
Prepared final plans, data for specifications, and engineer’s cost estimate for MnDOT and federal standards
-
Prepared construction staging and traffic control plans