• Intersection before photo – This photo shows the original configuration of the Golf Road and Golf Court intersection prior to construction.

  • Beginning of construction – This photo shows the early stages of construction. It highlights the cost-saving measure of utilizing pulverized pavement as a temporary roadway surface. It also highlights the reconfiguration of the existing retention pond to accommodate the realigned intersection.

  • Intersection roundabout during construction – This photo shows the mid-point of construction. The new configuration of the intersection is in place and vehicles are still running on the roadway base course.

  • Intersection roundabout final – This photo shows the intersection configuration post-paving. It shows newly configured pond and additional pedestrian accommodations installed to help connectivity between the different businesses in the area.

  • Access change final – This photo shows the overall scope of construction post-paving. As part of the project access, control changes were made to increase the overall safety of the corridor. These changes in access resulted in a heavy amount of business engagement both during design and construction.

  • Golf Road completed – This photo shows the finished project, including the development area that led to the need for the project. Project highlights include access control, increased pedestrian connectivity, parking lots and final landscaping features.